Free · no sign-up
Laser Cutting Gas Cost Calculator
Choose the assist gas and enter the consumption to get the gas cost per minute, per hour and per month for oxygen, nitrogen or compressed air. Don't know the consumption? Estimate it from nozzle and pressure or from your tank level. Free, no sign-up.
Switching the currency loads example prices in that currency; the formula stays the same.
Gas type
Changing the gas fills consumption, price and conversion factor with example values for that gas.
Consumption
Example: 18 m³/h for Nitrogen (N2). Enter the value from your flow meter or machine table.
Example: $0.35/m³ for Nitrogen (N2). Enter the price from your gas invoice.
Period (optional)
If entered, the monthly gas cost is calculated too.
How was this calculated?
Consumption
Entered value: 18 m³/h
Cost per minute
18 m³/h ÷ 60 × $0.35/m³ = $0.11
Cost per hour
18 m³/h × $0.35/m³ = $6.30
Put the gas difference into your quotes
In LazerCRM the rate per minute is set separately for each assist gas. Cutting time and part weight are read from your Metalix/MetalX DOCX report, and the quote is prepared as a branded PDF. The LazerCRM interface is currently in Turkish only. If you are interested, get in touch with us.
How do you calculate the gas cost of laser cutting?
In laser cutting, gas cost builds up while the gas is flowing, and the calculation is simple: gas cost per minute = consumption (m³/h) ÷ 60 × gas price per m³. With the example assumptions, 18 m³/h of nitrogen at $0.35/m³ costs $6.30 per hour, or about $0.11 per minute, while 3 m³/h of oxygen at $0.45/m³ costs $1.35 per hour, roughly $0.02 per minute.
If you don't know the consumption, there are two ways to estimate it. For high-pressure nitrogen and air cutting, consumption is roughly proportional to the nozzle cross-section and the absolute pressure: Q ≈ Q₀ × (d ÷ d₀)² × (p + 1) ÷ (p₀ + 1). Take the reference point from your machine maker's table; this scaling does not apply to low-pressure oxygen cutting. If you use a liquid tank, the start and end levels, the conversion factor and the cutting hours in that period give your real consumption.
With compressed air there is no gas bill; the cost is the compressor's electricity: compressor power (kW) × load factor × electricity price. Add the result to your machine rate per gas type – applying a single gas rate to every job can make nitrogen jobs look cheaper than they are. Results are rough starting values.
How to use the results
The results are technical estimates. For a binding quote, material price, scrap, labour and your own shop rules also have to be taken into account.
Frequently asked questions
How is the gas cost of laser cutting calculated?
Multiply the gas consumption (m³/h) by the gas price per m³ to get the hourly cost, and divide by 60 for the cost per minute. For example, 18 m³/h of nitrogen at $0.35/m³ costs $6.30 per hour, or about $0.11 per minute.
How do I calculate nitrogen consumption for laser cutting?
Measuring is most accurate: read the liquid tank level at the start and end of a period, convert the litres used into m³ with the conversion factor and divide by the cutting hours in that period. Without a measurement, you can scale a known nozzle, pressure and consumption from your machine maker's table to your own nozzle diameter and pressure.
How do nozzle diameter and pressure affect nitrogen consumption?
At high pressure, consumption rises roughly with the square of the nozzle diameter and with the absolute pressure. Going from a 1.5 mm to a 2 mm nozzle increases consumption about 1.78 times; raising the pressure from 14 to 16 bar increases it about 1.13 times. This does not apply to low-pressure oxygen cutting.
How many m³ of gas does 1 litre of liquid nitrogen give?
One litre of liquid nitrogen gives about 0.69 m³ of gas and one litre of liquid oxygen about 0.85 m³; the exact value depends on the reference temperature and pressure. Confirm the factor with your supplier so that it matches the unit on your invoice.
How do I calculate the cost of laser cutting with compressed air?
Instead of a gas bill, count the compressor's electricity: compressor power (kW) × load factor × electricity price per kWh gives the hourly cost. For example, a 15 kW compressor at 70% load and $0.28/kWh costs about $2.94 per hour, roughly $0.05 per minute; add dryer and filter maintenance separately.
How do I add gas cost to my machine rate?
Enter the hourly gas cost in the gas line of the machine hourly rate calculator, or add the per-minute amount to your rate. Keeping separate rates for oxygen, nitrogen and compressed air makes quotes for jobs with different gases more accurate.
Related calculators
- Machine hourly rate calculatorHourly cost, cost per minute and a profitable minute rate for a laser, press brake or CNC machine.
- Laser cutting cost calculatorCutting time, cost and price per part from cut length, number of pierces, material and thickness.
- Press brake bending cost calculatorBending price per part and per bend from number of bends, quantity and setup time.
Still quoting in spreadsheets?
LazerCRM reads your Metalix cutting report and prices every quote automatically with your own machine and material rates.